Infill — vacant lot to occupancy-ready
Transport, lot prep, set, utilities, skirting and make-ready run as one job with one schedule — because the industry's months go into the gaps between vendors, not into the work.
Where the industry's four to six months actually go
Infill in this industry commonly runs four to six months per lot at fifteen to thirty thousand dollars and up. Ask an operator where the time went and almost nobody can produce a breakdown.
It is not the construction. The physical work across the whole sequence — lot prep, set, utilities, skirting, make-ready — is a matter of days plus curing and inspection.
It is the handoffs. In the standard model that sequence is five separate vendors with five independent schedules, and no single party accountable for the date the lot starts earning. The transporter is waiting on the pad. The setter is waiting on the transporter. The utility contractor is waiting on the set. The skirting crew is waiting on the utilities. The make-ready crew is waiting on all of it. Every one of them is individually reasonable, and the gaps between them are where the months live.
What we change
One scope, one schedule
Lot prep through make-ready is a single scope with a single critical path, so there is no queue between trades that belong to different companies.
Permitting and utilities start at scope approval
Not at delivery. These are queue items outside anyone's control, and starting them early costs nothing. On most stalled programmes, this is where the time went.
Access walked before scheduling
The delivery path inside the community, not the road to it. A transport that arrives and cannot place the home is the single most expensive hour in the programme.
Electrical sizing checked at scoping
A lot that held a small single-wide may carry a service that will not support the incoming home. Finding that at connection is a utility-company timeline, not a contractor one.
One accountable date
One party answers for occupancy-ready. Not for delivery, not for set — for the lot earning.
We are not claiming faster crews. We are claiming there is no dead time between them, and on a four-to-six-month baseline that is where essentially all of the available improvement is.
Licensing, stated plainly
Installer licensing for manufactured homes is administered by HUD in some states and by the state itself in others, and it is not portable between states. [U.S. Government Publishing Office, current eCFR]
The consequence: the set of states where we can legally perform set and installation work is narrower than the set where we can perform renovation work. Interior and exterior renovation does not engage installer licensing; setting a home does.
We say this because it is the fact a careful operator would use to test a national contractor's claims, and because a contractor who does not volunteer it either has not read the rule or is hoping you have not.
Each state page states the licensing agency and our position for that state.
Programme economics
A single lot is a project. Ten lots is a programme, and the difference is not linear.
Crews stay mobilized rather than demobilizing and returning for each lot. Permitting runs in parallel. Utility scheduling batches. Material orders consolidate. A ten-lot programme is priced as one programme, on one mobilization and one schedule, which is why infill work belongs in a park-wide quote rather than in a bid per lot.
The individual scopes underneath are at home set and install, lot prep and site work and utility connections.
Common questions
Other programs
- National accountsA single agreement, a single account manager, and invoicing broken out by community, region and cost center — across every community in the portfolio.
- Turnkey make-readyVacant unit to rent-ready on a repeatable clock, with the same scope definition, the same price structure and the same photo documentation in every community.
- CapEx planningA community walk before budget season that produces a unit-by-unit scope and cost, phased across fiscal years — so the capital plan is built on evidence rather than on whichever unit failed most recently.
- Emergency & storm responseMobilize, stabilise, document for the carrier, then repair properly — with the scale to work a whole community rather than one home at a time.
- Client portal — NR OSEvery bid, job, crew schedule, photo and invoice on your account lives in one system rather than in somebody's inbox — and that is why the reporting is consistent across every community.