Interior
Kitchen and bath refresh
Bring the two rooms that matter most up to standard — without rebuilding rooms that do not need rebuilding.
- How it is priced
- Per room, by component scope
- Timeline
- Set in your written estimate, after the walk-through
- Who performs it
- NRBS crews, self-performed
What the price covers
In the scope
- Cabinet options: Reface, replace doors and hardware, or full replacement
- Countertop: Post-form laminate as standard; solid surface where the community supports it
- Tub and surround: Manufactured-home sizing — a standard site-built tub often will not fit
- Always checked: Supply lines, shut-offs, wax ring, and the subfloor beneath both rooms
Not in the scope
- Anything not written in the scope. Extra work found on site is raised as a written change order before it is done.
These are the two rooms a prospective tenant decides in
A make-ready budget has to go somewhere, and in a manufactured housing community the kitchen and the bath return more per dollar than anything else inside the home. A tired living room reads as lived-in. A tired bathroom reads as neglected.
The mistake is treating "refresh" as a single scope. It is a set of independent component decisions, and most homes need three of them rather than all eight.
The refresh-versus-replace decision, per component
| Refresh | Replace | |
|---|---|---|
| Cabinets | Boxes sound — new doors, drawer fronts and hardware | Water damage at the sink base, or the layout itself is the problem |
| Countertop | Rarely worth refinishing — it is a low-cost replacement | Almost always. Post-form laminate is inexpensive and transforms the room |
| Tub and surround | Surface refinishing where the tub is sound and only stained | Cracked, flexing, or a surround that has been leaking behind |
| Vanity | New top and hardware on a sound base | Swollen particleboard base — extremely common, and refinishing will not save it |
| Fixtures and hardware | Not applicable — these are consumables | Always on a turn. Cheap, immediately visible, and the first thing a tenant touches |
Most homes need three or four of these, not all of them.
Cabinets
- Refresh
- Boxes sound — new doors, drawer fronts and hardware
- Replace
- Water damage at the sink base, or the layout itself is the problem
Countertop
- Refresh
- Rarely worth refinishing — it is a low-cost replacement
- Replace
- Almost always. Post-form laminate is inexpensive and transforms the room
Tub and surround
- Refresh
- Surface refinishing where the tub is sound and only stained
- Replace
- Cracked, flexing, or a surround that has been leaking behind
Vanity
- Refresh
- New top and hardware on a sound base
- Replace
- Swollen particleboard base — extremely common, and refinishing will not save it
Fixtures and hardware
- Refresh
- Not applicable — these are consumables
- Replace
- Always on a turn. Cheap, immediately visible, and the first thing a tenant touches
Manufactured-home sizing will bite you
This is the detail that most reliably stalls a turn.
Manufactured homes frequently use fixture and cabinet dimensions that do not match standard site-built stock. Tubs are the usual culprit — a home may need a manufactured-home unit rather than a standard 60-inch tub, and the two are not interchangeable. Vanity widths and some cabinet runs have the same problem.
Ordering standard stock for a home that needs manufactured-home sizing means the bathroom sits out of service until the correct unit arrives, which on a turn schedule is the difference between a five-day turn and a fifteen-day one. We size from the home rather than from the catalogue.
What we check while the room is open
Every kitchen and bath scope includes an inspection that costs almost nothing at that moment and a great deal later:
- Supply lines and shut-off valves — braided stainless replacements are a few dollars and they are the most common origin of a flood
- Wax ring and toilet flange — a slow failure here is the leading cause of subfloor rot in a manufactured home
- Subfloor condition beneath both the toilet and the tub — soft decking found now is a subfloor repair; soft decking found after the finishes are in is a second demolition
If the deck under either room is failing, we will tell you before the finishes go in rather than build a new bathroom on top of a floor that is going to need replacing.
Also in interior
How the job runs
Walk-through
We walk the job with you in person and look at what is actually there.
Written scope
A written scope and price before any work starts, priced as shown above.
The work
Our own crews do it, to the written scope. Anything extra is a written change order first.
Final walk-through
We walk it again with you and close out anything on the punch list.
Step one is a walk-through.
Get a quoteCommon questions
W-9, written safety programme and certificates of insurance (GL and workers’ comp): being prepared. What is published so far is on vendor credentials.
Usually specified alongside
- Subfloor replacementReplace the failed decking rather than covering it, so the new flooring is not sitting on the same soft spot in eighteen months.
- Flooring & LVPDurable flooring chosen for how you live on it — one spec for a whole community or a single room in your home.
- Full interior remodelTake a home back to the studs and rebuild it — on a schedule you can plan around.
Where we perform kitchen & bath refresh
Self-performed crews based in Houston. Each city page carries local housing context.