Take a home back to the studs and rebuild it — on a schedule you can plan around.

How it is priced
Per home, by size and finish level
Timeline
Set in your written estimate, after the walk-through
Who performs it
NRBS crews, self-performed

What the price covers

In the scope

  • Typical sequence: Gut, belly and envelope, subfloor, rough-in, walls, kitchen and bath, flooring, paint, trim, punch
  • Finish level: Matched to the community's rent band, not to a showroom
  • Long-lead items: Tubs, cabinets and manufactured-home-sized doors — ordered at scope approval, not at install
  • Documented: Photographs at every milestone, not only at completion

Not in the scope

  • Anything not written in the scope. Extra work found on site is raised as a written change order before it is done.

When a remodel is the right capital decision

A full interior remodel makes sense when the parts that are expensive to replace are still good — the frame, the chassis, the roof structure, the envelope — and the parts that are cheap to replace have all failed at once.

That describes a great deal of the 1970s and 1980s stock sitting in communities today. The home is structurally fine. The interior is thirty years past its service life.

Against a replacement home, a remodel avoids the transport, the set, the utility connections, the lot preparation and the permitting that a new home triggers. Against a make-ready, it addresses the things a make-ready cannot: a floor system that is failing throughout, walls beyond matching, a kitchen that cannot be refreshed because the boxes are gone.

Where the frame is compromised, or where the home is simply too small for what the lot could earn, a replacement is the better decision. We will tell you that rather than sell you a remodel — see home set and install for what the alternative involves.

The sequence, and why it is in this order

  1. Gut

    Interior back to frame and studs. Everything that is being replaced comes out before anything new goes in, so nothing is installed over a condition nobody has looked at.

  2. Belly and envelope

    Belly wrap, insulation, and any roof or siding work. This is first for a reason: every later trade is installing into an environment this step defines.

  3. Subfloor

    Deck replaced where it has failed, over a belly that is now closed. Doing this before the belly is repaired is how a remodel needs a second floor in three years.

  4. Rough-in

    Plumbing and electrical corrections while the walls are open. The cheapest moment in the entire project to fix anything behind a surface.

  5. Walls and ceilings

    Drywall or VOG, taped, textured, and cured properly before paint touches it.

  6. Kitchen and bath

    Cabinets, tops, tub or surround, vanity, fixtures. Long-lead items must already be on site by this point.

  7. Flooring and paint

    One community-standard flooring spec and one community-standard colour, so future turns are touch-ups.

  8. Trim and punch

    Doors, casing, base, hardware, and a written punch list closed out with photographs.

What actually moves the schedule

Not labour. Our crews control demolition through paint and that sequence is predictable.

What moves a schedule is a long-lead item arriving late — a manufactured-home-sized tub, a cabinet run, a door that is not a stock width. Those are ordered at scope approval, not when the room is ready for them, which keeps a late part from stretching the whole remodel.

The other variable is discovery. A home opened up reveals conditions nobody could price from a walk: a supply line that has been weeping for two years, framing damage behind a wall, a roof leak that tracked somewhere unexpected. We photograph and price those as they surface rather than absorbing them silently or stopping the job — a change order you see on the day is cheaper for both of us than a surprise at invoicing.

Doing several at once

Remodelling a group of homes in one community runs on one mobilization and one schedule. Crews stay mobilized rather than demobilizing and returning, one material order covers the group, and trades stack across homes instead of queueing inside one.

If you have more than three homes in this condition, price them together — request a park-wide quote rather than a bid per home.

Also in interior

Ready when you are

Step one is a walk-through.

Get a quote

Common questions

When the chassis, frame and envelope are sound and the failure is everything inside them. A remodel avoids transport, set, utility connection and the permitting that a replacement home triggers. When the frame is compromised or the home is too small for the lot's rent potential, a replacement is the better capital decision and we will say so.

From the long-lead items, not from the labour. Demolition through paint is a predictable sequence our crews control. What moves a schedule is a tub, a cabinet run or a manufactured-home-sized door arriving three weeks after it was needed — which is why those are ordered at scope approval rather than when the room is ready for them.

Yes. Crews stay mobilized, one material order covers the group, and the trades stack across homes instead of waiting on each other inside one. Park-wide work is priced per unit against one scope.

Matched to the community's rent band. A remodel finished above what the market supports does not return the difference, and one finished below it does not lease. We ask what the target rent is before specifying finishes, which is a question most contractors never ask.

W-9, written safety programme and certificates of insurance (GL and workers’ comp): being prepared. What is published so far is on vendor credentials.