Commercial roofing
Commercial roofing for property owners and portfolio operators
The same crews, the same reporting and the same vendor file — applied to the commercial assets sitting in the same portfolio as your communities.
- How it is priced
- Per square, by system, with tear-off and deck priced separately
- Timeline
- Set in your written estimate, after the walk-through
- Who performs it
- NRBS crews, self-performed
One vendor file across two asset types
An operator who owns manufactured housing communities almost always owns something else in the same portfolio: a clubhouse, an office, a laundry building, a maintenance shop, a storage facility, a retail pad.
Those are commercial roofing assets. In most portfolios they sit with a different vendor, a different agreement, a different certificate of insurance and a different invoicing stream — which is administrative overhead that buys nothing.
We run commercial roofing under the same vendor agreement, with the same crews model, the same photo documentation standard and the same consolidated invoicing broken out by property and cost center as the community work. See national accounts for how that consolidation actually works.
What carries across, and what does not
We are precise about this because overclaiming here would be easy and it would be wrong.
What carries across is the operating model. Self-performed crews rather than brokered work. Documented condition before and after. Reporting an asset manager can read without a site visit. Response commitments that are written down.
What does not carry across is the technical scope. A commercial low-slope membrane roof and a manufactured home roof are different disciplines — different systems, different detailing, different failure modes, different crews. Anyone telling you the two are the same job is telling you something about their bidding practice rather than about roofing.
Where a roofing programme should start
Survey
Every roof in the portfolio: condition, remaining service life, and a repair-or-replace recommendation per roof with photographs.
Triage
Which roofs need work this year, which can be maintained, and which can wait — with the reasoning for each rather than a bid on all of them.
Programme
The work that has to happen now, phased across the budget cycle, with maintenance covering the rest.
Maintenance
Scheduled inspection and minor repair on the roofs that are still sound, which is what keeps the replacement list short.
Bidding every roof in a portfolio as if all of them need replacing is easy to do and expensive to buy. A survey that says three of these fourteen need work this year is worth more, and it is the sequence we recommend even though it is the smaller first invoice.
The systems
- TPO — the dominant single-ply low-slope system
- Metal and recoat — restoration on sound metal assemblies
- Repair — leak diagnosis and targeted repair
- Maintenance programs — scheduled inspection and minor repair
- Emergency response — storm and active-leak mobilization
Also in commercial roofing
Specification
What we install, and to what standard.
Full specification
- Systems
- TPO, metal, coatings and repair across low-slope and steep-slope
- Delivery model
- Self-performed, same crews and same reporting as the community work
- Vendor file
- One agreement, one vendor file, one invoicing stream across both asset types
- What we do not do
- Pretend a commercial roof and a manufactured home roof are the same job
Not in the scope
- Anything not written in the scope. Extra work found on site is raised as a written change order before it is done.
- Systems
- TPO, metal, coatings and repair across low-slope and steep-slope
- Delivery model
- Self-performed, same crews and same reporting as the community work
- Vendor file
- One agreement, one vendor file, one invoicing stream across both asset types
- What we do not do
- Pretend a commercial roof and a manufactured home roof are the same job
Not in the scope
- Anything not written in the scope. Extra work found on site is raised as a written change order before it is done.
Ready when you are
Step one is your scope, as it already exists.
Request a bidPricing a whole community? Request a park-wide quote.
Common questions
W-9, written safety programme and certificates of insurance (GL and workers’ comp): being prepared. What is published so far is on vendor credentials.
Usually specified alongside
- TPOA single-ply membrane system installed with the detailing that actually determines whether it lasts — seams, terminations and penetrations, not the field sheet.
- Maintenance programsScheduled inspection and minor repair on the roofs that are still sound, which is the only thing that keeps a replacement list short.
- Emergency responseStop the water, document the damage properly for the carrier, and come back for the permanent repair — in that order.
Where we perform commercial roofing overview
Self-performed crews based in Houston. Each city page carries local housing context.
