NR Building Solutions

Commercial roofing

Commercial roof maintenance programs

Scheduled inspection and minor repair on the roofs that are still sound, which is the only thing that keeps a replacement list short.

How it is priced
Annual, per roof, by area and complexity
Timeline
Set in your written estimate, after the walk-through
Who performs it
NRBS crews, self-performed

Maintenance is how the replacement list stays short

The budget problem with commercial roofing in a portfolio is not the cost of any individual roof. It is that several arrive at end of life in the same year, and nobody saw it coming.

A maintenance programme addresses both halves of that. It defers replacement on roofs that are still sound by catching the small failures that turn into wet insulation, and it forecasts the ones that cannot be deferred, so a capital plan is built against evidence rather than against whichever roof leaked most recently.

That second half is worth as much as the first. An operator who knows in March that three roofs need replacing next fiscal year is in a completely different position from one who finds out in September because a tenant called.

What a visit covers

  1. Clear

    Drains, scuppers and gutters cleared; debris removed from the field and from behind curbs where it traps water.

  2. Inspect

    Every penetration, termination, flashing and seam. Rooftop equipment and its supports. Any past repair.

  3. Repair

    Minor items fixed on the visit — a lifted seam edge, a failed sealant joint, a loose termination bar — rather than written up for a return trip.

  4. Report

    Written condition report per roof with photographs, the work performed, and a view on remaining service life.

The minor repairs made on the visit are most of the value. A lifted termination is a ten-minute fix in April and a saturated insulation board in November.

Traffic damage is the underrated cause

On buildings with rooftop equipment, a large share of the damage is not weather. It is people — HVAC technicians, communications contractors, anyone servicing equipment — walking the membrane, dropping tools, setting equipment down on the roof surface, and cutting through a membrane to run a new conduit without flashing it properly.

Roofs with heavy equipment traffic justify a higher inspection cadence than roofs without, for that reason alone. It is also the argument for walkway pads on routes to equipment, which is a cheap change that pays for itself on a roof being serviced monthly.

The warranty argument

Most manufacturer warranties on commercial roofing systems require documented maintenance to remain in force. A warranty claim on a roof with no maintenance record is a difficult conversation and frequently an unsuccessful one.

The written report from each visit is that documentation. It is worth having on file even for owners who never expect to make a claim, because it is also the record that supports a capital request.

Also in commercial roofing

Specification

What we install, and to what standard.

Full specification
Cadence
Twice yearly as standard — spring and autumn — plus after significant weather
Scope per visit
Drains cleared, debris removed, penetrations and terminations inspected, minor repairs made
Output
A written condition report per roof with photographs and a remaining-life view
Warranty
Most manufacturer warranties require documented maintenance to remain in force

Not in the scope

  • Anything not written in the scope. Extra work found on site is raised as a written change order before it is done.

Ready when you are

Step one is your scope, as it already exists.

Request a bid

Pricing a whole community? Request a park-wide quote.

Common questions

Drains and scuppers cleared, debris removed, every penetration and termination inspected, seams checked, minor repairs made on the spot, and a written condition report with photographs. The value is in the small repairs made before they become leaks, and in the report that tells you which roofs are moving toward replacement.

Twice a year as a baseline — once after winter and once before it — plus after any significant weather event. Roofs with heavy rooftop equipment traffic or a lot of penetrations justify more, because most of the damage on those roofs is caused by people servicing the equipment rather than by weather.

It catches small failures early. A blocked drain creating ponding, a lifted termination or an open seam is a small repair on the day and a larger one once water has been in the insulation. The aim is fewer roofs on the replacement list.

Most manufacturer warranties require documented maintenance to stay in force, and a warranty claim on a roof with no maintenance record is a difficult conversation. The written report from each visit is the documentation, which is a second reason to have one.

W-9, written safety programme and certificates of insurance (GL and workers’ comp): being prepared. What is published so far is on vendor credentials.