NR Building Solutions

Commercial roofing

Emergency and storm roof response

Stop the water, document the damage properly for the carrier, and come back for the permanent repair — in that order.

How it is priced
Emergency call-out plus time and materials; permanent repair quoted separately
Timeline
Set in your written estimate, after the walk-through
Who performs it
NRBS crews, self-performed

Three priorities, in this order

One: stop the water. An active leak is doing damage every hour — to inventory, to interior finishes, to insulation, and to the deck. Temporary stabilisation is the correct response, and it is explicitly temporary: a patch, a tarp, a sealed termination, whatever stops water entering right now.

Two: document. Dated photographs of the damage and, where it can be determined, the cause — taken before any temporary work covers it up. This is the step most often skipped under pressure, and it is the one that determines whether an insurance claim is straightforward or a fight.

Three: quote the permanent repair. As scheduled work, in daylight, on a dry roof, at ordinary rates.

Why the permanent repair does not happen on the emergency visit

This is worth being blunt about, because the opposite is common practice.

Permanent repairs made in the dark, in weather, on a wet surface, under time pressure, are the repairs that fail. Membrane does not bond to a wet substrate. Sealants do not cure in the conditions that caused the call. A crew working at 2am on a roof they cannot properly see does not do their best detailing.

A contractor who offers a permanent fix during the storm is charging emergency rates for compromised work, and the repair will be back on the schedule inside two years.

Stabilise now. Repair properly later. That sequence produces a repair that holds.

The documentation carriers actually want

Before anything is coveredPhotographs of the damage and the visible cause, timestamped
Event recordDate and time of the weather event, and of the response
Work recordWhat temporary measures were installed, and where
CauseWhere it can be established — carriers distinguish storm damage from deferred maintenance
Follow-upThe quoted permanent repair, so the claim covers the actual restoration

Claims are denied for missing documentation far more often than for the underlying facts. Ten minutes of photography on the emergency visit is the cheapest insurance in this scope.

Response commitments

We do not publish a response time on this page.

A published response time that is not backed by a specific agreement is a marketing figure, and an asset manager is right to be sceptical of one. Our response commitment is written into the agreement for each client, and it is a real commitment with a real consequence attached. See service commitments for how those are structured, and national accounts for portfolio-level response arrangements.

Also in commercial roofing

Specification

What we install, and to what standard.

Full specification
First priority
Stop water entering. Temporary, effective, and honest about being temporary.
Second priority
Documentation — dated photographs of the damage and the cause, before anything is covered
Third priority
A quoted permanent repair, made as scheduled work rather than in the dark and the rain
Never
A permanent repair sold as an emergency at emergency rates

Not in the scope

  • Anything not written in the scope. Extra work found on site is raised as a written change order before it is done.

How the job runs

  1. Walk-through

    We walk the units or the roof, or work from the walk sheet you already have.

  2. Written scope

    A written scope and price before any work starts, priced as shown above.

  3. The work

    Our own crews do it, to the written scope. Anything extra is a written change order first.

  4. Final walk-through

    We walk it again with you and close out anything on the punch list.

Step one is your scope, as it already exists.

Request a bid

Pricing a whole community? Request a park-wide quote.

Common questions

We stop the water and we document. Temporary stabilisation — a patch, a tarp, a sealed termination — is the correct response to an active leak, and it is not the permanent repair. Then we photograph the damage and the cause before anything gets covered up, because that is the evidence your carrier will ask for.

Because permanent repairs made in the dark, in weather, on a wet roof, under time pressure are the repairs that fail. Stabilise now, repair properly on a scheduled visit in conditions where the work can actually be done to standard. Anyone selling a permanent fix during a storm is selling emergency rates for compromised work.

Dated photographs showing the damage and, where it can be established, the cause — taken before any temporary work covers it. Also the date and time of the event, the date and time of response, and what was done. Carriers deny claims for missing documentation far more often than for the underlying facts.

To whatever we have committed to in your agreement. We do not publish a response time we have not agreed with a specific client, because a published number that is not backed by a contract is a marketing figure and you would be right not to trust it.

W-9, written safety programme and certificates of insurance (GL and workers’ comp): being prepared. What is published so far is on vendor credentials.