Utility connections for manufactured homes
Water, sewer, electrical and gas connected and inspected — the item that quietly controls the date a lot starts earning.
- How it is priced
- Per lot, by service and by what is found at the stub
- Timeline
- Set in your written estimate, after the walk-through
- Who performs it
- NRBS crews, self-performed
The scope that controls the calendar
Utility connection is a small amount of work and a large amount of elapsed time, and confusing the two is why infill programmes slip.
The physical connections are a matter of days. The queue — utility appointment, inspection, meter set — is weeks, and none of it is under a contractor's control. Where those queue items run in series rather than in parallel, and where nobody started them until the home was already on the lot, a two-week job becomes a two-month one.
This is the single most useful thing we do differently on an infill programme: utility scheduling starts at scope approval, not at delivery. It costs nothing to start early and it is often what decides when a lot starts earning.
What is at the stub is not knowable in advance
On a lot that has been vacant for years, the honest position is that nobody knows the condition of the existing services until they are exposed.
| Water | Corroded stub, failed shut-off, or a line damaged when the previous home was removed |
|---|---|
| Sewer | Damaged connection, root intrusion, or a blockage that has been there since the last home left |
| Electrical | Service sized for the previous home — often smaller than the one arriving |
| Gas | Capped stub of unknown condition; pressure testing is not optional |
We price the connection work and carry the stub condition as a separate line, discovered and photographed rather than estimated. Padding every lot for a stub problem most lots do not have is how an infill budget stops being usable.
Electrical sizing, checked before the home is scheduled
A lot that previously held a small single-wide may carry a service that will not support a modern double-wide, particularly one with electric heat.
Discovering that at connection is a multi-week delay: an upgraded service is a utility company timeline, not a contractor timeline. We check the existing service against the incoming home during scoping, which is a fifteen-minute task that routinely saves a month.
Freeze protection and the skirt
In any community that sees hard freezes, exposed water runs under the home need heat tape and insulation, and they need it before the first cold night rather than after the first frozen line.
This connects directly to skirting: the skirt has to be closed for freeze protection to work, and ventilated correctly so that closing it does not create a moisture problem underneath. Those two requirements pull in opposite directions and both have to be satisfied. Doing one without the other is how a community trades frozen lines for rotted bellies.
Also in structural & site
Specification
What we install, and to what standard.
Full specification
- Services
- Water, sewer, electrical, and gas where the community is served
- Freeze protection
- Heat tape and insulation on exposed runs in northern communities
- Inspection
- Coordinated with the authority having jurisdiction before the skirt is closed
- The unknown
- The condition of the existing stub, which is not knowable until it is exposed
Not in the scope
- Anything not written in the scope. Extra work found on site is raised as a written change order before it is done.
- Services
- Water, sewer, electrical, and gas where the community is served
- Freeze protection
- Heat tape and insulation on exposed runs in northern communities
- Inspection
- Coordinated with the authority having jurisdiction before the skirt is closed
- The unknown
- The condition of the existing stub, which is not knowable until it is exposed
Not in the scope
- Anything not written in the scope. Extra work found on site is raised as a written change order before it is done.
How the job runs
Walk-through
We walk the units or the roof, or work from the walk sheet you already have.
Written scope
A written scope and price before any work starts, priced as shown above.
The work
Our own crews do it, to the written scope. Anything extra is a written change order first.
Final walk-through
We walk it again with you and close out anything on the punch list.
Step one is your scope, as it already exists.
Request a bidPricing a whole community? Request a park-wide quote.
Common questions
W-9, written safety programme and certificates of insurance (GL and workers’ comp): being prepared. What is published so far is on vendor credentials.
Usually specified alongside
- Home set & install (infill)Infill is filling a vacant lot with an occupied home, and it is one job with one accountable party rather than five vendors and a gap in the middle.
- Lot prep & site workGet the pad, the grade and the drainage right before a home arrives, because nothing built afterwards can correct a lot that drains the wrong way.
- SkirtingClose the perimeter properly — ventilated, secured and accessible — because skirting is doing envelope work, not decoration.