Skirting installation and repair in manufactured housing communities
Close the perimeter properly — ventilated, secured and accessible — because skirting is doing envelope work, not decoration.
- How it is priced
- Per linear foot, by material
- Timeline
- Set in your written estimate, after the walk-through
- Who performs it
- NRBS crews, self-performed
Skirting is envelope work
The mistake is treating skirting as trim. It is doing four jobs, and only one of them is appearance.
It controls the under-home environment — the space where the plumbing runs and where the belly wrap and insulation sit. It excludes animals, which in a community is the difference between a maintenance call and a chewed-through supply line. It stops wind driving under the floor, which is a heating cost every month and a frozen line every winter in the northern half of the country. And it sets the perimeter appearance of the entire community, which is what a prospective tenant sees from the road before they see any individual home.
Damaged or missing skirting is therefore never only a cosmetic item on a walk sheet. It is an open envelope.
Ventilation: the error that shows up three years later
Enclosing the underside of a home without ventilating it correctly is worse than leaving it open.
Ground moisture evaporates continuously into that space. With adequate ventilation it leaves. With inadequate ventilation it condenses on the coldest surface available, which is the underside of the floor. The result is a rotted belly wrap, saturated insulation and — eventually — a soft subfloor, appearing two or three years after a skirting job that looked perfect on the day.
Vent area is sized to the enclosed area. It is a calculation, not a matter of adding a few vents to each side because that is what the last home had.
If the belly is already open or the insulation already wet, closing the skirt over it does not fix anything. See belly wrap and insulation — that scope belongs in the same visit.
Access panels
Every utility location — water shut-off, sewer clean-out, electrical, gas — needs a real, purpose-built access panel.
Where none exists, the first tech who needs access cuts a panel and wedges it back. From that point the skirting is permanently compromised at that spot, animals have a way in, and every subsequent tech does the same thing somewhere else. Within a few years the perimeter is a series of patches.
Access panels cost almost nothing at installation and are impossible to add tidily afterwards.
Material selection on a portfolio
| Vinyl, ventilated | The community standard. Cheapest per foot, single damaged panels swap out in minutes, correct appearance. |
|---|---|
| Metal | Where the same homes are hit repeatedly — mower and trimmer damage at corners, vehicle traffic on tight lots. |
| Masonry or simulated | Repositioning a community upmarket. Highest cost, best appearance, no panel-swap repair path. |
| Portfolio rule | One material and one colour per community, so a damaged panel is stock rather than a special order. |
The same standardisation argument that applies to flooring and paint applies here, and for the same reason: one spec means a damaged panel is replaced from stock in twenty minutes instead of becoming a purchase order.
Also in exterior & envelope
What the price covers
In the scope
- Vinyl: The community standard. Ventilated panel, bottom rail, top track.
- Metal: More impact resistant; the choice where mowers and traffic damage vinyl repeatedly.
- Ventilation: Sized to the enclosed area — under-ventilating is the most common installation error.
- Access: A real access panel at every utility location, not a cut panel wedged back in.
Not in the scope
- Anything not written in the scope. Extra work found on site is raised as a written change order before it is done.
How the job runs
Walk-through
We walk the units or the roof, or work from the walk sheet you already have.
Written scope
A written scope and price before any work starts, priced as shown above.
The work
Our own crews do it, to the written scope. Anything extra is a written change order first.
Final walk-through
We walk it again with you and close out anything on the punch list.
Step one is your scope, as it already exists.
Request a bidPricing a whole community? Request a park-wide quote.
Common questions
W-9, written safety programme and certificates of insurance (GL and workers’ comp): being prepared. What is published so far is on vendor credentials.
Usually specified alongside
- Belly wrap & insulationClose the underside of the home before anything is installed on top of it — this is the sequencing error that costs the most money in this category.
- Leveling, piers & tie-downsRe-level a home that has settled and bring the anchoring back to the wind zone spec — before the movement becomes a drywall, door and plumbing problem.
- Decks, steps & landingsBuild the entrance to code — graspable handrails, proper rise-and-run, and a landing that actually meets the door.
Where we perform skirting
Self-performed crews based in Houston. Each city page carries local housing context.