Belly wrap and underfloor insulation on manufactured homes
Close the underside of the home before anything is installed on top of it — this is the sequencing error that costs the most money in this category.
- How it is priced
- Per home for full replacement, per repair location for patching
- Timeline
- Set in your written estimate, after the walk-through
- Who performs it
- NRBS crews, self-performed
What the belly is, and what it does
The belly wrap is the sealed membrane running across the underside of a manufactured home, below the floor joists. Some people call it the bottom board or the belly board. It holds the underfloor insulation in place and it separates the inside of the floor system from the ground.
It is doing two jobs. It keeps the insulation dry and in position, so the floor performs thermally. And it keeps ground moisture, animals and debris out of the floor cavity.
On most homes in most communities built before about 2000, it is torn somewhere. Usually in several places.
The sequencing rule, and why it is the expensive one
The belly gets closed before anything is installed above it. Every time.
This is the single most costly sequencing error we see on manufactured housing renovation programmes, and it is common because the belly is invisible. Nobody walks a unit and notices the belly. They notice the soft floor.
Here is the mechanism. A torn belly lets ground moisture into the insulation. Saturated insulation holds that moisture directly against the underside of the deck, continuously, in every season. The deck softens. Someone replaces the deck, lays new flooring over it, and closes the job.
The new deck is now in exactly the environment that destroyed the old one. It fails on roughly the same timeline. The second repair costs more than the first, because this time the finish flooring is scrap as well.
Patch or full replacement
| Patch | Full replacement | |
|---|---|---|
| When it is right | Few tears, localised, insulation around them dry | Tears in several bays, insulation wet or displaced across the home |
| Insulation | Replaced only at the repair locations | Removed and replaced throughout |
| Time | Shorter: a localised repair | Longer: the whole underside. Set in your written estimate |
| Do it anyway when | — | The home is getting a full remodel, and the underside is open while everything else is. |
When it is right
- Patch
- Few tears, localised, insulation around them dry
- Full replacement
- Tears in several bays, insulation wet or displaced across the home
Insulation
- Patch
- Replaced only at the repair locations
- Full replacement
- Removed and replaced throughout
Time
- Patch
- Shorter: a localised repair
- Full replacement
- Longer: the whole underside. Set in your written estimate
Do it anyway when
- Patch
- —
- Full replacement
- The home is getting a full remodel, and the underside is open while everything else is.
What a proper repair looks like
A belly repair is patched with the same polyethylene material and sealed — not stapled fabric, not tape over a hole, not a piece of house wrap. A repair that is not sealed is an entry point again within a season, and rodents find it faster than anyone expects, because the insulation on the other side is nesting material.
Where insulation is wet, it comes out. Wet insulation does not dry in place under a sealed belly; it stays wet and it keeps working on the deck above.
Doing it at community scale
Belly work across a group of homes runs on one mobilization: access, staging and material are set up once for the group rather than once per home. If you are planning subfloor or flooring work across a community, price the belly across the same set of homes rather than home by home: request a park-wide quote.
Also in exterior & envelope
What the price covers
In the scope
- Belly material: Polyethylene bottom board, seamed and sealed to the frame
- Insulation: Batt or blown, replaced wherever it is wet or compressed
- Repair standard: Patched with the same material and taped — not stapled fabric
- Sequence: Belly closed BEFORE subfloor, flooring or skirting
Not in the scope
- Anything not written in the scope. Extra work found on site is raised as a written change order before it is done.
How the job runs
Walk-through
We walk the units or the roof, or work from the walk sheet you already have.
Written scope
A written scope and price before any work starts, priced as shown above.
The work
Our own crews do it, to the written scope. Anything extra is a written change order first.
Final walk-through
We walk it again with you and close out anything on the punch list.
Step one is your scope, as it already exists.
Request a bidPricing a whole community? Request a park-wide quote.
Common questions
W-9, written safety programme and certificates of insurance (GL and workers’ comp): being prepared. What is published so far is on vendor credentials.
Usually specified alongside
- Subfloor replacementReplace the failed decking rather than covering it, so the new flooring is not sitting on the same soft spot in eighteen months.
- SkirtingClose the perimeter properly — ventilated, secured and accessible — because skirting is doing envelope work, not decoration.
- Utility connectionsWater, sewer, electrical and gas connected and inspected — the item that quietly controls the date a lot starts earning.