Exterior & envelope
Decks, steps and landings
Build the entrance to code — graspable handrails, proper rise-and-run, and a landing that actually meets the door.
- How it is priced
- Per entry, by size and material
- Timeline
- Set in your written estimate, after the walk-through
- Who performs it
- NRBS crews, self-performed
Entries are the highest-liability item in a community
Walk a community with an insurer or an inspector and the entries get looked at first. They combine a visible defect with a direct injury path, and they are the item most likely to appear on a report, a claim or a lease-up objection.
They are also, relative to almost everything else on a renovation programme, cheap to put right.
The four things that are wrong on most entries
No landing at the door. A step down directly from the threshold means someone opening a door that swings toward them has to step backward and down simultaneously. This is the mechanism behind a large share of entry falls, and it is designed in rather than worn in. A proper landing is the single highest-value change on most manufactured home entries.
Inconsistent rise. People fall on the last step, and they fall because it is a different height from the ones above it. The last riser is where settlement shows up, where a rebuilt step meets original construction, and where the ground has moved. Consistency across the flight matters more than any individual dimension.
A handrail that cannot be grasped. A 2×4 laid flat across the tops of posts is the most common non-compliant rail in this category. It is a guard. A graspable handrail has a profile a hand can close around, holds a consistent height, runs continuously for the flight, and returns to the post at each end rather than stopping in space.
Bearing on the wrong thing. Steps or a deck taking support from the skirting or from the home will move as the home settles. The result is an inconsistent riser that comes back after every repair, because the repair addressed the tread rather than the foundation.
What we build
| Landing | Full landing at the door, sized to stand on with the door swinging |
|---|---|
| Rise and run | Consistent across the flight; verified against the finished grade, not the plan |
| Handrail | Graspable profile, continuous, returned at both ends |
| Guards | Where the walking surface is high enough to require them |
| Bearing | Independent footings on stable ground; never on skirting or the home |
| Material | Pressure-treated as standard; composite where a community is being repositioned |
Grade matters more than the drawing
An entry built to a drawing rather than to the actual finished grade is an entry with a wrong last step. Where lot grading has changed — settlement, added gravel, a re-graded drive — the flight has to be set from what is there now.
Where the grade itself is the problem, that is lot prep and site work rather than a step repair, and rebuilding the steps without fixing the grade is a repair with a known expiry date.
Community-wide entries
Entries are one of the best candidates for park-wide pricing. They are highly repetitive, the materials are common, and a crew that builds twenty in one mobilization is dramatically more efficient than one building them individually across a year of work orders. If your walk sheet has entries flagged across a community, price them together.
Also in exterior & envelope
What the price covers
In the scope
- Landing: A landing at the door — not a step directly down from the threshold
- Rise and run: Consistent across the flight; the last step is where people fall
- Handrail: Graspable, continuous, and returned to the post at the end
- Foundation: Bearing on stable ground, not on the skirting or the home
Not in the scope
- Anything not written in the scope. Extra work found on site is raised as a written change order before it is done.
How the job runs
Walk-through
We walk the job with you in person and look at what is actually there.
Written scope
A written scope and price before any work starts, priced as shown above.
The work
Our own crews do it, to the written scope. Anything extra is a written change order first.
Final walk-through
We walk it again with you and close out anything on the punch list.
Step one is a walk-through.
Get a quoteCommon questions
W-9, written safety programme and certificates of insurance (GL and workers’ comp): being prepared. What is published so far is on vendor credentials.
Usually specified alongside
- SkirtingClose the perimeter properly — ventilated, secured and accessible — because skirting is doing envelope work, not decoration.
- Doors, windows & trimReplace the units that are failing the envelope and the ones you touch daily, sized to fit your home.
- Lot prep & site workGet the pad, the grade and the drainage right before a home arrives, because nothing built afterwards can correct a lot that drains the wrong way.
Where we perform decks, steps & landings
Self-performed crews based in Houston. Each city page carries local housing context.
